JINGWEI Photovoltaic Power Station (5.6MW) has settled in the new and old factory areas, with a total investment of 16 million yuan. It will be completed in October 2023 and connected to the grid for power generation in November, adopting the "self use and surplus electricity grid connection" mode. Annual power generation of 5.51 million kWh, annual carbon reduction of 4500 tons, saving electricity costs of 4.3 million yuan and manufacturing costs of 3.5 million yuan. As a benchmark for green transformation, this power station is a milestone in JINGWEI's deep cultivation of the photovoltaic field: in 2017, it was the first to build a demonstration project with an annual output of 190000 kWh, pioneering local rooftop photovoltaics;
Now, leveraging the expansion of industries such as slewing bearings and slewing drives, and relying on the advantages of factory resources, the largest scale photovoltaic construction in history has been launched. The decision-making level collaborates with the EPC company through top-level design, strictly controls component selection and acceptance standards, and ensures high-quality operation. The power station is synchronously equipped with photovoltaic carports and charging piles, which not only empowers green production, but also provides convenience for employees to charge new energy vehicles, achieving a win-win situation of environmental protection, efficiency improvement and employee well-being.